Yulong Petrochemical

  • The total operating time reaches 144 hours under normal operating conditions.
  • At least 72 hours of warehousing peak test is included.
  • The equipment failure rate is 5 %d the system error rate is 5 %.
  • The project includes WMS system, intelligent warehouse control system, intelligent warehouse dispatching system, etc.